interface DrainageSample
What the drainage stage worked out about a sample, handed on to the cover rather than evaluated twice: how much of it is channel bed, how much is the valley's floodplain and margin, and how far the ground stands above the drainage datum once the valley is cut.
universe/src/cover.ts:208Members
aboveDatumreadonly
aboveDatum: number
Meters above drainageDatum, after the carve. Negative under the sea.
channelreadonly
channel: number
Channel bed, 0..1. See carveDrainage.
corridorreadonly
corridor: number
Floodplain and the valley's margin, 0..1 — the riparian corridor.